We perform:

  • Initial approval (ČSN EN 1176-1 ed. 2 Playgrounds, ČSN EN 14960-1 Inflatable play equipment)
    • a) construction design review
    • b) inspection of the manufacturing process
    • c) initial inspection and testing
  • In-service inspection – periodic testing